SAUDI ARABIAN BASIC INDUSTRIES CORPORATION RIYADH K.S.A
Some Key Projects from our SABIC works are highlighted here for reference:
Installation of Concealed Duct Type Air Conditioning units Fabrication:
The Scope of Project included Supply and Installation of Concealed Duct Air conditioners
Installation of New 20 Bench Scale Reactor Units for the HDPE:
The Scope of Project included Shifting, Erection & Installation of Machine along with the allied utility connections.
Erection of PTA Storage Unit:
The Scope of Project included, Erection & Installation of anexplosion proof storage room, alongside exhaust systems, air intake systems, air balancing, civil works and electro mechanical works.
Modification of 03 NO.s of Fire & Gas panels in Lab-02:
The Scope of the Project included commissioning assistance during the lockdown of the plant for modification and testing and commissioning for the upgrade of Tyco Fire Panels in Sabic STC-R
Upgrading the Zone Managers STC-R:
The Scope of the Project included upgrading 12 zone managers, alongside HVAC upgrades including DDC panels, louvers, defective controllers and field devices. The project included working under shutdown conditions.
Installation of Concealed Duct Type Air Conditioning units Fabrication:
The Scope of Project included Supply and Installation of Concealed Duct Air conditioners.
Supply and Installation of PVC Lab Equipment:
The Scope of the Project included the Supply and Installation of lab equipment for SABIC STC-R including installation, testing, and commissioning, and vendor assistance.
- SAUDI ARABIAN BASIC INDUSTRIES CORPORATION